Bishop Guertin High School Case Study

Download Description

Bishop Guertin prides itself on being more than a school. Bishop Guertin is a community of genuine, caring people who feel like family and a place where everyone belongs. Since 1963, nearly 9,000 students have walked down the school halls, the heartbeat of the school. Naturally, Ron Cote, Dean of Students, and the school’s staff wanted to keep the students safely in school, and the plan was to reopen in August 2020. The school began researching air purification controls as an added preventative measure to its comprehensive safety protocols for reopening. Bishop Guertin had already upgraded their HVAC systems with MERV filtration but still needed high-quality air purification units for many rooms to increase air exchanges.

Related Downloads

View Recent Blogs

Nous nous attachons à fournir des solutions avancées de gestion de l'énergie et de qualité de l'air intérieur aux écoles, aux entreprises et aux organisations dans l'ensemble des États-Unis.

©2024 InTech Energy, Inc. DBA Sanalife and E360. All rights reserved. Various trademarks held by their respective owners.